Projects
Completed Projects
S. No | Description of the work | Name of Employer | Date of Start / Commencement | Date of Completion |
---|---|---|---|---|
1. |
Formation of impervious layer in Up stream of Madikheda dam by Jetgrouting column using high pressure and double fluid method. |
Govt. of Madhya Pradesh | 21-Jun-06 | 7-Nov-06 |
2. |
Providing Cut-off walls by Jetgrout Columns at the inlet & outlet of diversion tunnels of Baglihar Hydroectric Project (450 MW) in Jammu & Kashmir. |
Jaiprakash Associates Limited | 10-Nov-06 | 16-Aug-07 |
3. |
Permeation Grouting Cofferdam at Lower Subansiri HE Project (Lot SSL:1) |
BGS - SGS - SOMA JV | 9-Jan-08 | 29-Apr-08 |
4. |
Construction of Jet Grout Column for Cutoff wall for Karcham Wangtoo Hydroelectric Project, Himachal Pradesh |
Jaiprakash Associates Limited | 27-Jul-06 | 15-Jul-08 |
5. |
Back slope stablization of Power House from EI +1435 m to EL +1407 1390m of Parbati HE project, Stage II (H.P.) |
NHPC | 06-May-06 | 9-Sep-06 |
6. |
Slope Stabilisation at Power House 'Parbati HE Project , HP |
GIL / NHPC | 20-Aug-04 | 10-May-06 |
7. |
Strengthening of the Slope Sliding Area at Tirumala. |
TTD, Tirumala | 18-Jan-06 | 25-Jan-08 |
8. |
Stabilization of land slide affected area of KHEP Stage I & II switchyard by Jet grouting & slope stitching using soil mechanic methods to BUMI. |
Govt. of Maharastra | 17-Dec-05 | 25-Apr-06 |
9. |
330 MW Shrinagar Hydro Electric Project,Power House Slope Stabilisation works including Drilling, Grouting & Anchoring in Uttarakhand |
GVK Projects Ltd | 1-Dec-07 | 31-Mar-10 |
10. |
Construction of Spillway Terrace Drilling and Grouting for Koldam HEP. |
ITD Public Co. Ltd. | 4-Dec-07 | 18-Feb-09 |
11. |
Installation of Ground Anchors at New Delhi Station |
M/s Alpine-Samsung-HCC JV | 18-Jul-08 | 22-Mar-09 |
12. |
Installation of Kingpost by ODEX method from New Delhi to Talkatora Garden |
M/s Alpine-Samsung-HCC JV | 27-May-08 | 31-Oct-08 |
13. |
Boring & Installation of Soldier Piles at New delhi Station |
M/s Alpine-Samsung-HCC JV | 16-Feb-08 | 02-Sep-08 |
14. |
Construction of Civil works of Soft Ground Tunnel (NATM) on North side of Pirpanjal Tunnel on Laole-Quzigund section of Udhampur-Srinagar-Baramula New BG Railway Line Project. |
ER / IRCON | 19-May-06 | 20-Apr-07 |
15. |
Construction of Civil works of Soft Ground Tunnel (NATM) on North side of Pirpanjal Tunnel on Laole-Quzigund section of Udhampur-Srinagar-Baramula New BG Railway Line Project. |
Gammon India Ltd. (GIL) | 19-Apr-05 | 06-May-06 |
16. |
Access road to Adit 3A, Adit 3A and portion of Head Race Tunnel Works From Adit 3A at 3A at 70 MW Budhil Hydro Electric Power Project at Chamba District, Himanchal Pradesh, including Adit 4 |
Lanco Infratech Ltd. | 21-Jul-07 | 14-Apr-10 |
17. |
Const. of Tunnels & Balance Civil Works including Cut & Cover between km 139+705 - 140+850 (Zone -IIIC) on Laole - Qazigund section of Udhampur - Srinagar - Baramulla New BG Railway Line Project. (khari) |
IRCON International Limited | 03-May-07 | 18-Sep-08 |
18. |
Excavation of 300m of Face IV of HRT in all respect of Bhilangana III HE Project. |
Bhilangana Hydro Power Limited | 03-Nov-07 | 31-May-09 |
19. |
Construction of Two ROBs in Lieu of LC - 101 & 101A at Muzaffarpur, Bihar |
IRCON | 28-Nov-05 | 08-May-07 |
20. |
Construction of one Road Over Bridges (R.O.B) in Bihar including sub-structure Super-structure, approaches etc complete in all respect at Patna in lieu of LC 31 between Sachivalaya and Fulwarisharif -Package II B |
ER / IRCON | 21-Feb-06 | 15-Jul-10 |
21. |
Piling works for Pallet Plant Project, Paradeep |
Essar Constructions India Ltd. | 25-Jul-08 | 25-Jul-10 |
22. |
M.P - Piling works for 2x600 MW Thermal Power Plant Project, at Mahan |
Essar Constructions India Ltd. | 15-Dec-08 | 23-Jul-10 |
23. |
Civil works of Limestone Crusher and Auxiliary works at Kashlog Mines Crusher |
Ambuja Cements Ltd. | 03-Aug-08 | 08-Jun-10 |
24. |
Tunneling works for Rouri Project in Himachal Pradesh. |
Ambuja Cements Ltd. | 03-Aug-08 | 30-Apr-10 |
25. |
Stablisation of soil strata for foudation of conveyor stresties of OLBC at six locations at Suli Project |
Ambuja Cements Ltd. | 23-Jan-09 | 30-Apr-10 |
26. |
Installation of Anchors including supply of Tendons & all other materials (Unless stated otherwise), Equipment stressing and extraction of anchors. |
Larson & Toubro Ltd. | 13-Mar-08 | - |
27. |
Installation of Anchors including supply of Tendons & all other materials (Unless stated otherwise), Equipment stressing and extraction of anchors at Hauz Khaz Station |
Metro Tunneling Group | 01-Oct-08 | 30-Nov-08 |
28. |
Installation of Anchors including supply of Tendons & all other materials (Unless stated otherwise), Equipment stressing and extraction of anchors at Malviya Nagar Station |
Metro Tunneling Group | 01-Oct-08 | 30-Nov-08 |
29. |
330 MW Shrinagar hydro Electric Project, Tehri/Pauri Dist., Uttarakhand State-Jet Grouting for Power House Coffer Dam |
GVK Projects Ltd. | 11-Dec-07 | 30-Sep-08 |
30. |
330 MW Shrinagar Hydro Electric Project, Dam Right Flank Slope Stabilisation works including Drilling, Grouting & Anchoring |
GVK Projects Ltd. | 02-Jan-08 | 30-May-11 |
31. |
LOT-II Construction of all civil works of Head Race Tunnel from RD (1000 to 8300) including two access Adits & Gabini Gad for Phata Byung HEP (2x38 MW) Uttarakhand. |
Lanco Infratech Ltd. | 18-Aug-08 | 18-Feb-11 (Foreclosed & Handed Over) |
32. |
Slope Protection & Consolidatation Grouting Works for Rangpo Dam - Right Abutment at CHEPP, Sikkim |
Gati Infrastructure Ltd. | 11-Aug-09 | 10-Jan-11 |
33. |
Construction of Power House at Jorethang Loop HEP, Sikkim-Jet Grouting along cofferdam |
DANS Energy | 05-Mar-10 | 05-May-11 |