logo
  • sitemap
  • Sitemap
  • HOME
  • ABOUT US
    • Company Profile
    • Vision
    • State of Art Equipment
    • Corporate Structure
  • SERVICES
    • Geo Tec Specialization
      • Foundation Engineering
        • Diaphragm Wall
        • Bored Piling
        • Secant Piling
        • Micro Piling
        • King Post
        • Soldier Piling
        • Sheet Piling
      • Ground Improvement
        • Jet Grouting
        • TAM Grouting
        • Permeation Grouting
        • Compaction Grouting
        • Cavity Grouting
        • Chemical Grouting
      • Slope Stabilization/Deep Excavation
        • Ground Anchors
        • Pile Anchors
        • Soil Nails
        • Rock Anchors
        • Rock Bolt
        • Shortcrete
      • Cut-Off Walls
    • Tunnels
      • Micro Tunneling
      • NATM Tunneling
      • Drill and Blast
    • Hydro-Power
    • Port
  • PROJECTS
    • On Going Projects
      • Jet Grouting Works
        • Hydro Electric, Teesta
        • Cross Passages Works, Chennai Metro
      • Piling Works
        • Thermal Power Works
        • Bangalore Metro Project
      • Diaphragm Wall
        • D-Wall, Chennai Metro
      • Slope Stabilization
        • Hydro Electric, Teesta
        • Hydro Electric, Sikkim
        • Flood Protection, Kollidam
      • Road Over Bridge
        • R.O.B, LC-74
        • R.O.B, LC 101-101A
      • Soil Consolidation Works
        • Permeation Grouting, Koldam
        • TAM Grouting, Punatsangchhu-I
      • Tunnel
        • NATM Tunnel, Banihal
      • Anchors Works
        • Hydro Electric, Teesta
      • Cut and Cover
        • Cut & Cover BR-4, Banihal
        • Cut & Cover 144B-144C, Banihal
        • Cut & Cover BR-8, Banihal
    • Completed Projects
  • INVESTOR RELATIONS
  • CAREERS
  • CONTACT US
HomenextGeo Tec SpecializationnextSlope Stabilization/Deep Excavation

Projects

List of On-Going Projects
  • Tashiding HE Project
  • Teesta JG
  • Punjab Piling
  • Jal Power
  • Teesta Slope Stabilization
  • Koldam Project
  • Kollidam Project
  • JK Rail T-77B_T-77C
  • JK Rail BR-4
  • JK Rail 144B-144C
  • JK Rail BR-8
  • Chennai Metro Project
  • Bangalore Metro Project
  • Patna LC_74 Project
  • Punatsangchhu-I Projects
  • Cross Passages JG

Slope Stabilization/Deep Excavation

Slope Stabilization

There has been a significant increase in the infrastructure development in hilly areas such as construction of hydro power projects, highways and construction. The increased economic activity has resulted in an increase in landslides in the hilly areas resulting in loss of infrastructure and lives. This has led to widespread concern on risks associated with disturbance of hills and mountain slopes. Therefore, Slope protection & stabilization has become an essential activity in any infrastructure project that has risks of landslides & slope failures due to construction or weather disturbances.

Slope Stabilization is a process that involves first spraying of wet cement concrete (100 mm thick) on the slope to be stabilized. This process is called shotcrete. Post this a wire mesh fabric is applied on the first layer with small nails and second layer shotcrete (100 mm) is applied. Further the soil is nailed by drilling the slope and inserting grout tubes and then sealing them with anchor nails.

Through our extensive technical & operational experiences we have gained wide respect as a quality job specialist engineering company providing slope stabilization & protection.

Deep Excavation

Deep excavation technology is a very popular internationally as it enables real estate developers to effectively utilize the land area by building multi-level basement parking. In India, deep excavation technology is a growing area used in construction of underground tunnels, metro stations, under passes & crossings and other infrastructure development.

However very few players in India use this technology in real estate developments (such as construction of high rise apartments, office complexes and shopping malls) due to lack of a specialist contractor. Currently, relying on conventional methods of construction, they are only able to build single/double basement car parking in their projects. This decreases the total value of the project due to lack of effective land utilization and high cost of construction (time and manpower) associated with the conventional methods. With increasing globalization, the awareness of this technology is increasing among the Indian real estate developers.

Slope Stabilization/Deep Excavation

Geo Technical Specialised Works

    Foundation Engineering

  • Secant Piling
  • Bored Piling
  • Soldier Piling
  • Sheet Piling
  • Micro Piling
  • King Post
  • Diaphragm Wall

    Ground Improvement

  • Jet Grouting
  • Permeation Grouting
  • Chemical Grouting
  • TAM Grouting
  • Compaction Grouting
  • Cavity Grouting

    Slope Stabilitation

  • Ground Anchors
  • Pile Anchors
  • Soil Nails
  • Rock Anchors
  • Rock Bolt
  • Short Crete

    Other Specialised Works

  • Cut & Cover
  • Cross Passenge
  • Pipe Roofing
  • Trussel Brg
  • Guide Wall
  • Quality Control
  • Core Sampling

© Copyright 2013 BUMI. All rights reserved

Designed by ImagiNET Ventures