Projects
List of On-Going Projects
Secant Piling
Secant piles are formed by constructing intersecting reinforced concrete piles. The piles are
reinforced with either steel rebar or with steel beams and are constructed by either drilling
under mud or augering.
Primary piles are installed first with secondary piles constructed
in between primary piles once the latter gain sufficient strength. Pile overlap is typically in
the order of 3 inches (8 cm). In a tangent pile wall, there is no pile overlap as the piles are
constructed flush to each other.

