logo
  • sitemap
  • Sitemap
  • HOME
  • ABOUT US
    • Company Profile
    • Vision
    • State of Art Equipment
    • Corporate Structure
  • SERVICES
    • Geo Tec Specialization
      • Foundation Engineering
        • Diaphragm Wall
        • Bored Piling
        • Secant Piling
        • Micro Piling
        • King Post
        • Soldier Piling
        • Sheet Piling
      • Ground Improvement
        • Jet Grouting
        • TAM Grouting
        • Permeation Grouting
        • Compaction Grouting
        • Cavity Grouting
        • Chemical Grouting
      • Slope Stabilization/Deep Excavation
        • Ground Anchors
        • Pile Anchors
        • Soil Nails
        • Rock Anchors
        • Rock Bolt
        • Shortcrete
      • Cut-Off Walls
    • Tunnels
      • Micro Tunneling
      • NATM Tunneling
      • Drill and Blast
    • Hydro-Power
    • Port
  • PROJECTS
    • On Going Projects
      • Jet Grouting Works
        • Hydro Electric, Teesta
        • Cross Passages Works, Chennai Metro
      • Piling Works
        • Thermal Power Works
        • Bangalore Metro Project
      • Diaphragm Wall
        • D-Wall, Chennai Metro
      • Slope Stabilization
        • Hydro Electric, Teesta
        • Hydro Electric, Sikkim
        • Flood Protection, Kollidam
      • Road Over Bridge
        • R.O.B, LC-74
        • R.O.B, LC 101-101A
      • Soil Consolidation Works
        • Permeation Grouting, Koldam
        • TAM Grouting, Punatsangchhu-I
      • Tunnel
        • NATM Tunnel, Banihal
      • Anchors Works
        • Hydro Electric, Teesta
      • Cut and Cover
        • Cut & Cover BR-4, Banihal
        • Cut & Cover 144B-144C, Banihal
        • Cut & Cover BR-8, Banihal
    • Completed Projects
  • INVESTOR RELATIONS
  • CAREERS
  • CONTACT US

Services

Foundation Engineering
  • Diaphragm Wall
  • Bored Piling
  • Secant Piling
  • Micro Piling
  • King Post
  • Soldier Piling
  • Sheet Piling
Ground Improvement
  • Jet Grouting
  • TAM Grouting
  • Permeation Grouting
  • Compaction Grouting
  • Cavity Grouting
  • Chemical Grouting
Slope Stabilization/Deep Excavation
  • Ground Anchors
  • Pile Anchors
  • Soil Nails
  • Rock Anchors
  • Rock Bolt
  • Shortcrete
Tunnels
  • Micro Tunneling
  • NATM Tunneling
  • Drill and Blast

Jal Power

Pre Stressed Ground Anchors & Soil nails for slope protection at power house at Rangit stage IV H.E. project (3x40 MW), Sikkim -On going Project


Narration:


Stabilizing the slope at Power house of Rangit stage IV Hydro Electric Project to an average width of 134 mtr and height of 77.8 Rm (from Elevation 414 to Elevation 336.20 mtr) by installing Anchors and Soil nails.

 

Details on 31.10.11  

 

No of Anchors :

nos of depth 17230 mtr (of 25 mtr,20 mtr depth)

No of Soil nails :

2492 Nos of 30207 mtr (of 6 mtr & 12 mtr depth)

No of Drain Hole :

495 nos of each 5040 mtr


Loading image. Please wait

Geo Technical Specialised Works

    Foundation Engineering

  • Secant Piling
  • Bored Piling
  • Soldier Piling
  • Sheet Piling
  • Micro Piling
  • King Post
  • Diaphragm Wall

    Ground Improvement

  • Jet Grouting
  • Permeation Grouting
  • Chemical Grouting
  • TAM Grouting
  • Compaction Grouting
  • Cavity Grouting

    Slope Stabilitation

  • Ground Anchors
  • Pile Anchors
  • Soil Nails
  • Rock Anchors
  • Rock Bolt
  • Short Crete

    Other Specialised Works

  • Cut & Cover
  • Cross Passenge
  • Pipe Roofing
  • Trussel Brg
  • Guide Wall
  • Quality Control
  • Core Sampling

© Copyright 2013 BUMI. All rights reserved

Designed by ImagiNET Ventures